Estimate only. Also works for vinyl plank and engineered wood. Check the box for the exact coverage.
How to use this calculator
Enter the room size, the waste allowance and the coverage printed on the box. Press Calculate to see the boxes of laminate, the rolls of underlayment and the room perimeter for trim.
The formula
Boxes = room area × (1 + waste %) ÷ coverage per box (rounded up)
Underlayment rolls = room area ÷ 100 sq ft
Perimeter = 2 × (length + width)
Example: A 15 ft × 12 ft room is 180 sq ft. With 10% waste and 20 sq ft boxes you need 10 boxes and 2 rolls of 100 sq ft underlayment. The perimeter is 54 ft.
Planning your laminate flooring order
The calculator gives you the boxes, underlayment rolls and trim length for one room. These numbers form your shopping list. Before you buy, check a few details that can change the count or the final cost.
Worked examples
The example room above is 15 ft by 12 ft. It covers 180 square feet. With 10 percent waste, that is 198 square feet. At 20 square feet per box, it rounds up to 10 boxes. It also needs 2 rolls of underlayment and about 54 feet of trim.
Now take a 14 ft by 11 ft bedroom laid on a diagonal. The area is 154 square feet. With 15 percent waste, that is about 177 square feet. With boxes that cover 22 square feet, you need about 8.05 boxes, so you buy 9. If one box costs $45, the planks cost about $405 before tax.
What changes the amount you need
- Layout: Straight layouts waste the least. Diagonal and herringbone patterns waste more.
- Room shape: Rooms with many corners, closets or angled walls need more cuts.
- Plank length: Longer planks can create more offcuts in small rooms.
- Box coverage: This varies by product, so always use the number printed on the box.
Tips before you install
- Check that the subfloor is clean, dry and flat. Most products list how much unevenness is allowed.
- Leave the expansion gap around the edges that the instructions call for. Baseboard or quarter-round covers it.
- Mix planks from several boxes as you go so the color and pattern look even.
- Buy all boxes from the same lot number if you can.
- Keep one spare box after the job for future repairs.
Common mistakes
- Skipping the waste allowance and running short on a discontinued style.
- Forgetting transition strips at doorways and where floors meet other surfaces.
- Using the full perimeter for trim without subtracting door openings.
- Installing over damp concrete without a moisture barrier.
Budgeting the whole job
Planks are only part of the cost. Add underlayment, trim, transition strips, a tapping block and pull bar, and a saw blade suited to laminate. If you are hiring an installer, ask whether removing the old floor, moving furniture and disposal are included in the quote.

