Enter your own quotes for materials and labor. A contingency of 10 to 20 percent covers surprises such as hidden damage.
How to use this calculator
Enter the cost of materials, labor, permits and any other costs from your quotes. Choose a contingency percentage and add the project area if you want a cost per square foot. Press Calculate to see your total renovation budget.
The formula
Subtotal = materials + labor + permits + other costs
Contingency = subtotal × contingency %
Total budget = subtotal + contingency
Example: Materials of $8,000, labor of $6,000 and permits of $500 give a subtotal of $14,500. With 15% contingency ($2,175) the total budget is $16,675, which is $83.38 per square foot for a 200 sq ft room.
How to build a realistic renovation budget
The calculator adds your quotes, then adds a contingency for surprises. The total budget is the amount you should be ready to spend, not the amount you hope to spend. The cost per square foot helps you compare quotes and check against similar projects.
A bathroom example
Say a 50 sq ft bathroom has $6,000 in materials, $7,000 in labor, $300 in permits and $700 in other costs. The subtotal is $14,000. In an older home, a 20 percent contingency adds $2,800, for a total budget of $16,800. That works out to $336 per square foot. Small rooms with plumbing, tile and fixtures often cost much more per square foot than open living areas.
What drives the cost
- Scope: Moving plumbing, walls or windows costs far more than replacing finishes in place.
- Finish level: Cabinets, countertops, tile and fixtures can vary several times in price for the same room.
- Age of the home: Older homes are more likely to hide rot, outdated wiring or plumbing that must be updated.
- Labor market: Rates vary by region and season. Busy contractors may charge more or book months out.
Tips for accurate numbers
- Get written, itemized quotes so you can compare the same scope from each contractor.
- Price your finishes yourself before you meet contractors. Allowances in quotes are often low.
- Include delivery, disposal, dumpster rental and cleanup in other costs.
- Add costs of living around the work, such as eating out during a kitchen remodel.
Common mistakes
- Spending the contingency on upgrades before the project is finished.
- Changing plans mid-project. Change orders often cost more than the same choice made up front.
- Skipping permits to save money. Unpermitted work can cause problems with insurance and resale.
- Paying most of the price before work starts.
Planning the money
Decide how you will pay before you sign a contract. Cash, a home equity loan or line of credit, and personal loans each have different costs and risks. This tool is for budgeting only and is not financial advice. Talk with a financial advisor or lender if you plan to borrow. For structural, electrical, plumbing or gas work, hire licensed contractors and follow local building codes.